R12 Methodology - OUM

R12 Methodology - OUM

http://atawaynt.ar.ataway.com/OUM/METHOD/OM40/OUM_E_6.3/OUM/OUM_HOME.HTM

OUM (Oracle Unified Method is new methodology to implement Oracle projects)
No more AIM Methodology.

OUM:  Oracle Unified Method
It has 5 phases.
Inception Ã  Requirement Gathering and risk analysis
The overriding goal of the Inception phase is to have concurrence among all stakeholders on the
lifecycle objectives for the project. Therefore, the Inception phase is critical for all projects because
the scope of the effort, high-level requirements, and significant risks must be understood before the
project can proceed.

Eloboration Ã  Design
The overriding goal of the Inception phase is to have concurrence among all stakeholders on the
lifecycle objectives for the project. Therefore, the Inception phase is critical for all projects because
the scope of the effort, high-level requirements, and significant risks must be understood before the
project can proceed.

Construction Ã  Build
The goal of the Construction phase is to take the solution from detailed requirements models, through
configuration of standard packaged software functionality, development and testing of custom
components, and integration to a system that is ready for a first release that goes into production, often
a limited release and often called a beta release. In short, complete the development of the application
system, validate that all components fit together, and prepare the system for the acceptance test and
deployment.

Transition Ã  Moving solution to production
The goal of the Transition phase is to take the completed solution from installation onto the
production system through the acceptance test to launch of the live application, open, and ready for
business. Validate that the system is tested systematically and is available for end users. During this
phase, the new system is accepted by the client organization, the organization is made ready for the
new system, and the system is put into production and, if the new system replaces an old one, a
smooth cutover to the new application is provided.

Production  Ã  Opearating Production system
The goal of the Production phase is to operate the newly developed system, assess the success of the
system, and monitor and address system issues. This includes monitoring the system and acting
appropriately to maintain continued operation; measuring system performance; operating and
maintaining supporting systems; responding to help requests, error reports and feature requests by
users; and managing the applicable change control process so that defects and new features may be
prioritized and assigned to future releases and put into a plan for future enhancements.
Documents:
AN100 (AN Ã  Analysis) Ã  Functional Specification Document (MD050 Replacement)
DS140 (DS Ã  Design Specification) Ã¨ Technical Design Document (MD070 Replacement)
T020 (Unit Test Plan Document)
Refer below screen shot for details.

Comments

  1. Oracle Apps R12 and Fusion Cloud Self Paced Training Videos by Industry Experts. Please Check https://www.oracleappstechnical.com

    ReplyDelete

Post a Comment

Popular posts from this blog

Oracle Subledger Accounting (SLA) Tables, Views

Oracle Subledger Accounting (SLA) Tables, Views Oracle Subledger Accounting Tables: TABLE NAME DESCRIPTION XLA_AAD_GROUPS The XLA_AAD_GROUPS table stores the merge dependencies analyzed during the merge analysis.  All application accounting definitions with the same GROUP_NUM must be merged together. XLA_AAD_HDR_ACCT_ATTRS The XLA_AAD_HDR_ACCT_ATTRS stores standard, system and custom sources assigned to an accounting attribute at the AAD level. XLA_AAD_HEADER_AC_ASSGNS Store the analytical criteria for the application accounting definitions. XLA_AAD_LINE_DEFN_ASSGNS This table stores the journal lines definitions for the application accounting definitions. XLA_AAD_LOADER_DEFNS_T The XLA_AAD_LOADER_DEFNS_T table is the interface table that facilitates the data transfer from data files and the database. XLA_AAD_LOADER_LOGS The XLA_AAD_LOADER_LOGS table stores the errors and logs generated by the application accounting definitions loader. XLA_AAD_SOURCES XLA_AAD_SOURCES table stores a...

Oracle Fusion Cloud: Supplier Import Process using File Based Data Import (FBDI)

 Supplier Data Migration or Upload to Oracle Fusion environment File-Based Data Import for Oracle Procurement Cloud Supplier import in oracle fusion   In this post , We will discuss about Supplier import in oracle fusion. Oracle has provided the FBDI tool to import suppliers from External  Source  to the Oracle fusion. Supplier Import in Oracle fusion we first need to  Download  the Supplier Import FDBI  templates  given by the Oracle fusion to import suppliers. Oracle has given 5 Different FBDI templates to Import supplier in Fusion. Here in this post , I will share the Complete steps for Supplier import in oracle fusion. You can refer this post for Supplier Import.   Steps for Supplier import in oracle fusion     Step1- First we need to download Supplier Data  Template  from Oracle Repository. Go to this path for Oracle Repository. ( select Based on your Cloud version) https://docs.oracle.com/en/...

Unbilled Receivables and Unearned Revenue Accounting in Oracle Projects

Unbilled Receivables and Unearned Revenue Accounting in Oracle Projects Introduction When it comes to contractual billing, invoice and revenue generation are two separate processes, which during the lifespan of a project may or may not always coincide with each other and so do the balances in revenue and receivables accounts.  This interim difference between revenue and invoice account balances is bridged using Unbilled Receivables (UBR) and Unearned Revenue (UER) Accounts. Unearned Revenue (UER) Unearned Revenue (also termed as deferred revenue or UER) signifies money received for the goods or services, which are yet to be delivered.  As per the principles of Revenue Recognition, UER is recorded as on the balance sheet unless it is converted to Revenue upon delivery of goods or services For Example XYZ Consulting Ltd. receives an annual maintenance contract of $ 12,000 on Dec 31, 2014 for the period of Jan 01, 2015 to Dec 31, 2015. At the start of the contract as of Dec 31, 2...